Could Any one suggest me the equipment i need please.

With a quarter cabinet, you'd need to supply the following:

PDU

Switch

Power cables & network cables for your equipment

Comments

  • Umm, that's about it apart from labelling the server. (I can't remember of any other things I had to mail in when I colo'd)

  • because that's my first time to colo..and i don't know which band is good

  • @ttbbs168: It depends on whether you are going to rack this yourself or have the colo provider do it for you. But:

    1. Screws + retained nuts - check gauge of rack

    2. PDU should be provided on 1/4 rack, if not then make sure you get confirmation of the power feed connector type. Best to get a switched PDU so you can remote reboot without having to pay for remote hands to do it.

    3. Switch

    4. Power / Ethernet / KVM

    5. Rails for the servers (also check that the depth of the rack is sufficient for the server)

    6. Is it 2 post or 4 post rack? You may need to get specific rails for the equipment

  • key900key900 Member, Provider
    edited August 2015

    all that good as @MarkTurner mentioned. If you can't use rails try Gruber. Ask the provider some people won't require rails.

    *LetBox.Com Make it Simple, Dallas & Los Angeles - Pure NVMe + Block Storage Boxes!. Discord Community https://discord.gg/g6dqjmm
  • PhotonVPSPhotonVPS Member, Provider

    Pretty sure the providers includes the PDU in a 1/4 setup.

    Psychz Networks - Dedicated Servers, Co-location | PhotonVPS - SSD Cloud | YardVPS - Storage VPS | Layer 7 DDoS Mitigation

    6 Continents - 14 Cities - LAX, DAL, CHI, ASH, LON, AMS, JNB, TPE, TKY, BOM, GRU, BCN, SIN, SYD | Moscow & Seoul coming soon...

  • ClouviderClouvider Member, Provider

    @PhotonVPS said:
    Pretty sure the providers includes the PDU in a 1/4 setup.

    You can't generalise. Depends on the contract / offer.

    Clouvider Limited - Leading EU Provider || Dedicated Server Sale - Our Latest LET Offer

    Cloud Web Hosting | SSD & SAS HA OnApp VPS | UK, NL & DE Dedicated Servers | Network Services | Colocation | Managed Services

  • jbilohjbiloh Administrator

    Everyone is going to be different. For the most part we include PDUs in 1/4 cabinet deals. At the same time we shy away from them and prefer to start with 1/2 cabinets.

    Jon Biloh
  • @MarkTurner said:
    ttbbs168: It depends on whether you are going to rack this yourself or have the colo provider do it for you. But:

    1. Screws + retained nuts - check gauge of rack

    2. PDU should be provided on 1/4 rack, if not then make sure you get confirmation of the power feed connector type. Best to get a switched PDU so you can remote reboot without having to pay for remote hands to do it.

    3. Switch

    4. Power / Ethernet / KVM

    5. Rails for the servers (also check that the depth of the rack is sufficient for the server)

    6. Is it 2 post or 4 post rack? You may need to get specific rails for the equipment

    Again, it depends whether the provider lends you that equipment during the period of which you colocate with them :)

  • I need to know the band that people use. thanks .

  • dustincdustinc Member, Provider

    @ttbbs168 said:
    I need to know the band that people use. thanks .

    I believe you mean brand? If so, PDUMH20 is a decent PDU, Rackmountbale, and 1U (perfect for 1/4 racks)

    RackNerd LLC - Introducing Infrastructure Stability
    Dedicated Servers, Private Cloud, DRaaS, Colocation, VPS, DDoS Mitigation, Shared & Reseller Hosting

  • doghouchdoghouch Member
    edited August 2015

    @dustinc I didn't have enough time to visit the QN Datacenter in LA... aw :/


    I really wanted to see the operations, but to @ttbbs168: collocating with QN would be a good choice as they are just plain awesome. Good network, nice facilities, everything I could dream of.